Follow Us on Twitter

Monday, 28 December 2009

Winter stirrings at Devonshire Tunnel


This is the grassed area above the filled cutting at Devonshire Tunnel at Christmas 2009 and at last, there's a (small) piece of real physical work on the route. The yellow pip in the centre foreground marks the position of a core sample taken to prove the material used to fill the cutting. We're confident that this is spoil removed from the embankment to the north, but best to be sure.